Wednesday, 26 June 2013

More work on the carriage


Following on from yesterday there was plenty to do


I got the doors together and a coat of paint on
They just need another coat or two and the window sashes


Here is the carriage and the doors just awaiting a rub down and a final coat
I am finding the acrylic paint is drying very slowly and not laying as flat as I would like
Maybe it is time to look a bit deeper into spraying


Another little job is to make up the lanterns that go alongside the driver
These are the parts


Also the hand rails for the drivers section
The pattern is under the left hand one


Here is the drivers section again just needing a light rub and a top coat


Here is the carriage pretty much painted
Just tiny bits of touching up after the fancy stuff goes on


This is one of the fancy bits
2 x 2mm strips of Sapeli to make edges look good


Here is the carriage with the strips all done


And finally I make a start on the wheels
I will have to turn down the volume as there could be some swearing or cursing!!!

No comments:

Post a Comment